Drylining costs: comparing the work inside a quotation

Compare a measured wall package, with its layers, openings and finish stated, before comparing totals.

Call 01904 929185

Metal wall studs and floor tracks inside an office refurbishment.

Drylining can be priced by the square metre of complete partition or lining, with openings and other work listed separately, or as a defined room package. Establish which basis the quotation uses. One price may include both boarded faces and jointing while another covers board supply alone. The wall system, full construction height, access and handover finish determine what the figure buys.

First decide whether the job is a wall, a lining or a complete room

A partition creates a division between spaces. A lining creates a new face beside an existing wall. Both may use plasterboard, but the supporting construction and the work around them differ. A room package may also include openings, junctions, finishing and coordination with several other trades. An estimate based on a generic board area cannot describe all three equally well.

Ask for the system reference and its intended use. Fire, acoustic, duty and height requirements can influence the frame, board arrangement, cavity components and detailing. If a designer has already specified these, provide that information with the enquiry. If the design is still unresolved, separate the cost of defining it from a firm installation price based on a settled construction.

Check what the measured area includes

A partition has two faces. A wall lining usually creates one new face beside the existing wall. When a quotation lists square metres, ask whether that quantity describes the partition elevation, each boarded face or the board material itself. These are different measurements even on a plain rectangular wall.

For a simple arithmetic example, take a partition 3 metres long and 2 metres high, with no openings. Its elevation area is 6 square metres. One board layer on each side uses 12 square metres of board-face area before cutting losses; two layers on each side uses 24. The selected system determines the actual layers. These figures explain quantities, not a price or a suitable partition specification.

Returns, cuts and waste still have to be considered separately. A contractor may price the complete partition by its elevation area while including all specified layers in the rate. That is a clear basis if it is stated. Problems arise when an elevation quantity is compared directly with a board-supply quantity or when the finish to the second side is omitted.

Illustrative quantities for a 3 m × 2 m partition with no openings
MeasurementCalculationArea before cutting losses
One elevation3 m × 2 m6 m²
One board layer on both sides6 m² × 2 faces12 m²
Two board layers on both sides6 m² × 2 faces × 2 layers24 m²

An opening removes wall area but adds work

A doorway needs framing and a relationship with the door set. Its jambs and head may have details that differ from the regular wall. Glazing, access panels and service openings introduce their own requirements. Subtracting every opening from a square-metre total does not account for the work needed around its perimeter.

The quotation should identify which openings are included and who supplies and installs the associated components. A drylining contractor may be pricing the prepared opening while another package supplies the door set. Both parties need the same dimensions and detail. Otherwise a lower partition price can simply reflect missing work that has not yet appeared in somebody else's quotation.

Why similar wall areas can produce different scopes
DifferenceWork it can introduceUseful quotation detail
Greater construction heightDifferent system selection and installation accessFull height and selected assembly
More openingsFraming, returns and interface detailsOpening schedule and responsibilities
Existing wall defectsInvestigation and preparation before liningDefined preparatory scope
Occupied premisesProtection, phased access and repeated handoversWorking areas and periods
Demanding decorationSamples, preparation and agreed finishing stagesFinish schedule and handover condition

Preparation should be visible in the price

For a bonded lining, the condition of the background is central to the installation. Removal of loose finishes, investigation of defects and suitable preparation should not be hidden inside a vague allowance. The selected adhesive system needs an appropriate substrate. If the wall has not been inspected sufficiently to confirm that, the quotation should say what remains uncertain.

A framed lining also needs preparation and suitable support conditions. It does not make unresolved moisture or unstable material disappear. Define what has to be completed behind the new face and who is responsible for it. If opening-up is necessary, agree how that stage will establish the remaining scope rather than pricing an unknown wall as though it were ready to board.

The route into the building affects the installation

A clear ground-floor unit with protected storage presents different working conditions from a small upper-floor room reached through an occupied office. Material handling, storage, waste removal and protection all belong in the programme. Provide the actual route and any restrictions before asking contractors to commit to dates.

Phasing can also change the organisation of work. Completing one room at a time may be necessary for the occupier, but it can require separate visits or repeated protection and handover stages. Describe the rooms that remain in use and the work periods available. The quotation can then reflect a workable sequence rather than assuming unrestricted access that the premises cannot provide.

Office corridor with taped plasterboard walls and repeated door openings.

Services and equipment create boundaries between packages

Power, data, controls and wall-mounted equipment need positions and compatible details. Supports can be easier to install before the wall closes, while accessory openings may affect the selected performance construction. Identify who coordinates them and who completes the relevant treatments. Leaving each trade to assume the other has included the detail creates a gap in the combined scope.

Changes after boarding should be described as changes. Moving an opening can involve the frame, services, replacement boards, joint treatment and decoration. The quotation should explain the basis for pricing instructed alterations, but it should not rely on a large unspecified contingency for every possible future layout. A settled brief makes the initial price more meaningful.

Ready for decoration needs an agreed meaning

Tape and jointing includes the specified treatment of board joints, fixing positions and corners. Decoration can require further preparation, primer and coatings. Spell out the handover stages rather than assuming that the phrase ready to paint includes the same work in every offer. The selected finishing and decorating products need their appropriate sequence and conditions.

Retained surfaces beside new work also need attention. Does decoration stop at the new board, extend to a whole wall or include the room? Who repairs damage by follow-on trades? A clear boundary prevents a customer from expecting a fully redecorated space when the priced package only finishes the new partition face.

Compare the exclusions as carefully as the total

Put the proposed system, preparation, openings, services, finish and access assumptions beside each other. Differences often become obvious without any complicated calculation. A missing inspection, a provisional door detail or excluded decoration may explain why one figure appears lower. Resolve those items before deciding which offer covers the required result.

Keep the accepted drawings and specification with the quotation. A substituted board or changed opening can affect the wall construction as well as the total. The final documents should identify the assembly actually installed, including agreed changes.

Questions and answers

What should a square-metre drylining rate include?

The rate should identify the wall system, measured area and included operations: support or adhesive, boards, insulation where specified, joint treatment and the agreed finish. Ask whether openings, returns, access and decoration are included or measured separately. Compare prices only once those boundaries match.

Is direct bonding always less expensive than framing?

No. Extensive background preparation or service alterations can change the comparison. Price each suitable option to the same finished scope, including its window and door returns.

What should a provisional allowance explain?

It should identify the unresolved work or information and how the final scope will be established. An unexplained sum for possible extras makes quotations harder to compare.