System specifications
Fire-performance specifications for drylined partitions
Ask for the required fire resistance and a complete partition reference, including its head, doors and service openings.

Fire resistance belongs to the finished partition: boards, frame, fixings, joints, head and openings. A stack of pink boards on site does not establish what the wall will achieve. The specification has to identify the construction required in that position, and the installation has to preserve it through every layer and junction.
Find the requirement before selecting the wall
For an office or other non-domestic building, start with the fire strategy and the relevant guidance in Approved Document B Volume 2. Ask the designer which walls protect an escape route, enclose a risk or form a compartment boundary, and what integrity and insulation performance each needs. Put those requirements beside the wall types on the drawings before choosing boards.
A corridor wall, an enclosure around a service zone and a division within an open office can perform different roles. Show those wall types separately on the drawings. In an existing building, check what the new partition will meet above the ceiling and below any raised floor. A wall that looks continuous from the occupied room may leave an unaddressed route through one of those concealed spaces.
Read the board layers and frame together
British Gypsum's A206015 (B) (EN) is a named example, not a default for every project. Its technical specification uses two 12.5 mm Gyproc WallBoard layers on each face of the specified frame and reports 30 minutes for both fire integrity and fire insulation under the stated EN test basis. Ordinary WallBoard in that complete construction has a documented result; a board colour is not the rating.
The component schedule also identifies framing, screws, joint support, perimeter sealing and finishing. The inner and outer board layers have different fixing instructions, and their joints are staggered. Those details explain why the visible face is only part of the inspection. A tidy outer layer cannot show whether an inner layer has been omitted or whether its joint sits directly behind the next one.
Keep the precise system reference, including its suffix and test basis. The same broad product family can contain several arrangements. A legacy sheet or a similar wall with a different board build-up is not interchangeable evidence. Check the current selected construction against the project's required height and performance before materials are ordered.
British Gypsum identifies BS EN 1364-1, the fire-resistance test for non-loadbearing walls, for the GypWall Single Frame family. Read the individual system evidence against the required construction and test basis. A duration quoted under a different test or classification cannot be accepted simply because the number of minutes is the same; the project designer needs to confirm the applicable evidence.
Distinguish material classifications from resistance of an assembly
Fire integrity concerns the separating element staying closed against flame and hot-gas passage during the test. Fire insulation concerns the temperature rise on its unexposed side. These are different functions, even when their published durations are the same. Reaction to fire is different again: it concerns a material's contribution to fire development. An individual board's classification does not supply a time rating for an assembled wall.
Gypsum's behaviour under heat contributes to the board's protective role, but the lining must remain part of the intended construction. Gaps, unsupported edges and altered interfaces cannot be assessed by looking only at the board product. The required resistance and the evidence supporting the proposed wall must be considered together by the responsible project team.
Treat doors and penetrations as designed interfaces
A cable, pipe or duct passing through the partition interrupts its separating layers. The appropriate sealing arrangement depends on the actual service, opening and supporting wall. Check the permitted wall type and thickness, service material and size, clearances and supports in the relevant detail. Filling the visible annular gap with a product bearing a fire label is not enough to establish that combination.
A door opening needs coordinated framing and a suitable door-set interface. Its weight and movement also affect the surrounding construction. The drylining and door packages should agree on the opening dimensions, support and perimeter treatment before the board is cut. For later service additions, keep the wall reference available so the next trade does not treat a finished partition as an unrestricted route.
Scroll sideways to see the full table. Keyboard: focus the table, then use the arrow keys.
| Part of the work | Required information | Coordination point |
|---|---|---|
| Main wall | Selected complete-system reference | Procurement and installation documents agree |
| Head and perimeter | Applicable junction details | Support and movement conditions confirmed |
| Doors and glazing | Specified assemblies and interfaces | Opening and frame information coordinated |
| Services | Permitted penetration details | Responsibilities between trades recorded |
| Changes | Accepted revised detail | Updated information reaches the workface |
Preserve the head and junctions
Where the structure above can move relative to the partition, the head must accommodate that movement while retaining the specified separating function. The gap is part of a designed arrangement of framing, board edges and sealing components. A rigidly fixed board edge or an obstruction in the movement zone can defeat its purpose. The structural movement allowance and the compatible head detail need to be supplied together.
Profiled soffits, beams and changes in ceiling level create shapes that a straight head track alone cannot close. Draw the partition's route through those features and use the appropriate substantiated junction. Do the same at an abutting wall or column. A decorative trim can hide an irregular edge, but the separation behind it still has to be completed.
Adding material is not automatically an improvement. British Gypsum notes that cavity insulation can change thermal bowing and the applicable fire-height limit. An acoustic change therefore needs checking against the fire specification too. Select a documented arrangement that meets both requirements rather than adding an unlisted component to an otherwise selected wall.
Check concealed details while they can still be seen
Inspect the frame, openings and first board layer while they remain visible. Then check the next layer against its own arrangement of joints and fixings. Include the wall above the ceiling line: paint and ceiling tiles may hide that part at handover, but they do not remove it from the specified construction.
The installation record should show what was built and where. A close photograph of a seal is much more useful when its wall reference, service and applicable detail are identifiable. If a delivery contains an alternative board or metal section, hold that substitution for technical acceptance before it is installed. Similar thickness is not evidence that it belongs in the selected assembly.

Keep the final record useful for future alterations
Commercial interiors often change after the original fit-out. A later door move, cable route or room division can affect an existing partition's intended function. Retain the final system schedule, relevant details and accepted changes so that future work has a reliable starting point. The record should describe the installation as completed, rather than preserve only the earliest tender proposal.
A later opening should be checked against the original wall construction and the new service or door detail. Keep the accepted changes with the wall schedule, including work above ceilings. At handover, distinguish completed work from outstanding inspection or design matters. A decorated face is a finish, not evidence that an unresolved junction has been assessed.
- Identify the project's requirement for the particular wall.
- Select and record the complete construction and interfaces.
- Resolve proposed substitutions through the responsible design process.
- Inspect concealed work and retain the final accepted information.
Questions and answers
Can the colour of a board identify the wall's fire resistance?
No. The performance of a wall must be assessed through the documented complete construction and its application, not inferred from a board's appearance.
Can a partition be selected before the building requirements are set?
Set the wall requirements first, then select a system that meets them. Ask for the wall schedule and relevant fire-strategy information with the tender enquiry, including the required head, door and service details.
Sources and further reading
- British Gypsum A206015 (B) (EN): complete-system technical specificationRelease/version: 28 July 2022 technical specificationSource checked: 30 October 2026
- British Gypsum system principles: partition interfaces, height and fire behaviourRelease/version: Relevant sections: 11 September 2023Source checked: 30 October 2026
- British Gypsum BPG002: Deflection headsSource checked: 30 October 2026
- FIS drylining guidanceSource checked: 29 October 2026
- Approved Document B, Volume 2: Buildings other than dwellings, 2019 edition with 2026 amendments and future 2029 changesRelease/version: 2019 edition with consolidated amendments, including future provisionsSource checked: 31 October 2026
- British Gypsum: GypWall Single FrameSource checked: 31 October 2026