New walls for commercial interiors
Metal-stud partitions
Plan the full wall thickness, doors and fittings before selecting the stud and board arrangement.

A metal-stud partition uses steel channels and upright studs to support plasterboard on each face. It can divide an open floor into offices, meeting rooms, stores or circulation space. The visible finish hides the frame, but the choices made inside it determine how much room the wall takes up and how it performs in use.
What is inside the wall?
The floor and head channels establish the wall line. Studs stand between them, with the specified boards fixed to the framework. The cavity may contain insulation and coordinated services. Openings, corners and junctions require their own details rather than simply interrupting a standard length of wall.
A partition is normally non-loadbearing: it is not there to support the floor or roof above. It still has to resist the loads relevant to its use, remain stable at its installed height and carry any fixtures included in its design. A tall wall, a heavy door and a cupboard full of files can each affect the selected construction.
Ask for the duty rating as well as the height limit. British Gypsum identifies BS 5234 duty ratings for its GypWall systems; these describe a partition construction, rather than the load capacity of an individual screw. A busy corridor, door opening and wall-mounted cabinet introduce different demands, so list them before a system is selected.
The stud name does not give the finished thickness
The overall wall includes both boarded faces and the complete frame arrangement. Board type and the number of layers change the result. Use the published thickness of the selected construction when setting out rooms and ordering door frames; do not assume that a nominal stud size is the space the wall will occupy.
The examples below are two named British Gypsum constructions. Both use 70 S 50 studs, but they have different boards, layer counts and published overall thicknesses. They also have different performance data. Choosing the slimmer example is not a general substitute for the thicker one.
Scroll sideways to see the full table. Keyboard: focus the table, then use the arrow keys.
| Published system | Boarding on each face | Published partition thickness |
|---|---|---|
| GypWall A206015 (B) (EN) | Two layers of 12.5 mm Gyproc WallBoard | 122 mm |
| GypWall Enhanced L206013 (EN) | One layer of 12.5 mm Gyproc Habito | 97 mm |
Set out openings and furniture before boarding
A door opening needs more than a gap in the studs. The frame, door weight, closer and surrounding support must work together. The clear opening also has to suit the room layout and any access requirements. Moving it after the wall is boarded can involve rebuilding the opening, changing services and making good both faces.
The same applies to fittings. A screen, wall cabinet or basin needs an appropriate fixing arrangement for its load and use. Where backing or additional support is required, it is much easier to install while the cavity is accessible. Marking the positions on the room layout gives the installer something specific to build to, including the height as well as the horizontal position.

Height changes the frame specification
A short partition and a wall extending through a tall ceiling void do not necessarily use the same studs. The unsupported height, frame arrangement and expected loading affect the specification. Additional board layers alone should not be treated as a way to make any frame suitable for a greater height.
The head connection matters too. Where the structure above moves, a suitable deflection detail lets that movement occur without loading the partition. Its channels, board positions and junction treatment are part of the selected system. The structural designer establishes the movement requirement; the drylining detail must accommodate it.
Coordinate sockets and pipes with the wall
Services are easiest to resolve before the second face is closed. Socket boxes need the correct support and detailing for the wall. Pipes and cables passing through a separating wall can create openings that affect sound or fire performance. Their route, size and treatment should be included in the design.
An instruction to add a socket late in the programme may therefore involve more than cutting a neat hole. It can disturb insulation, backing or a protected construction. Where a wall has performance requirements, later alterations need checking against the documented assembly and any relevant penetration detail.
Privacy needs the adjoining details
A partition's laboratory sound-insulation figure describes a tested construction. A completed room includes a door, ceiling, floor and service routes, all of which can allow sound to travel around it. An open ceiling void or poorly sealed perimeter may undermine the separation even if the board faces look complete.
Explain the room's use in the brief. An occasional meeting room, a confidential interview room and a noisy workshop have different expectations. Those expectations guide the designer towards the wall, door and junction details needed for the whole space. Acoustic panels within the room may reduce reverberation, but do not replace the separating construction.
Keep the fire specification intact
Where a partition needs fire resistance, the evidence applies to a particular construction. Board type, layers, framing, fixings and perimeter treatment all contribute. A different product that appears similar may not have the same evidence in that assembly.
This is especially important at doors, above ceilings and around services, where the wall meets other work. The quotation and installation drawings should identify those interfaces and who completes them. A neat joint or a board marketed for fire resistance is not, by itself, proof of the completed wall's performance.
British Gypsum names BS EN 1364-1 as the fire-resistance test basis for its GypWall Single Frame family. The individual system schedule must still match the wall being proposed. A test-standard name on a brochure does not establish the required fire resistance for your room or permit changes to the tested build-up.
From frame to finished room
Once the concealed work is complete, the remaining boards can be installed and the joints finished with the specified system. Corners, fixing positions and board joints need consistent treatment. Lighting can make shallow surface differences more obvious, particularly where windows or fittings cast light along the wall.
Agree the decoration and lighting expectations early enough to influence the finish. Allow the required drying time before subsequent coats and protect the completed surface from following trades. The final inspection should include the wall's junctions, doors and fittings as well as the appearance of the broad painted face.
- Set out the complete wall and opening dimensions.
- Build the specified frame and supports.
- Coordinate concealed services, insulation and junction details.
- Close the wall and complete its board and joint treatment.
- Decorate and inspect the adjoining finishes.
Questions and answers
Can a metal-stud wall support a large display screen?
Yes, with a specified support arrangement for the screen and bracket. Give the designer their weight, projection and fixing positions before boarding. The board, backing and frame then have defined loads to carry.
Can the wall be moved later?
Yes, many partitions can be altered or rebuilt. Allow for the affected floor, ceiling, services and doors, and check the new room arrangement against its fire and acoustic requirements before removing the wall.
Are the two wall examples interchangeable?
No. The table illustrates how different complete constructions produce different thicknesses. Selection also depends on height, loading and the required acoustic and fire performance.
Sources and further reading
- British Gypsum GypWall A206015 (B) (EN)Source checked: 30 October 2026
- British Gypsum GypWall L206013 (EN)Source checked: 30 October 2026
- British Gypsum TGN123 maximum system heightsSource checked: 29 October 2026
- British Gypsum deflection headsSource checked: 29 October 2026
- British Gypsum internal partitions and wallsSource checked: 29 October 2026
- Knauf Insulation acoustic principlesSource checked: 29 October 2026
- British Gypsum White Book finishes and jointingSource checked: 29 October 2026
- British Gypsum: GypWall Single FrameSource checked: 31 October 2026